Building Permits in ZIP 10022
Manhattan, NY — 1,627 permits filed recently
1,627 permits
Replacement of 2 ton split system in the 20th floor, conference room. no change to egress, use, or occupancy.
Renovation of an existing duplex apartment on the 3rd and 4th floors. Work includes non-structural demolition, general construction and minor mechanical modification as per plans filed herewith. no ch...
Suspended scaffolding during nb construction, filed separately under application # m00505081. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this...
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Associated areaway and facade repairs as per drawings. No change in use, egress or occupancy is involved under this application.
New stair opening in 10th Floor slab as shown on drawings. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Removal of interior partitions finishes and ceilings and removal of portion of existing floor slab of existing 10th Floor as shown on drawings. No change in use, egress or occupancy.
Replacement of 2 ton split system in the 20th floor, conference room. no change to egress, use, or occupancy.
Remove all mech equipment, and associated apparatus.
Modification to existing mechanical system on the 8th floor as per drawings filed herewith. no change to use, occupancy, or egress
Interior alteration of apartment #4f. no change in use, occupancy or egress.
Existing ground floor commercial area and one family dwelling unit above. removal of non-bearing walls, stairs finishes, railings, doors, trim, kitchens and bathrooms as per plans-demolition work only...
Suspended scaffolding during nb construction, filed separately under application # m00505081. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this...
Renovation of an existing duplex apartment on the 3rd and 4th floors. Work includes non-structural demolition, general construction and minor mechanical modification as per plans filed herewith. no ch...
Plumbing modifications taking place on the 16th & 17th Construction floor as per plans filed herewith. No change in use, egress or occupancy.
Interior renovation @ partial 2nd & 3rd floor plan(apts. #2bc ,3b & 3d) in an existing 4 story w/ cellar building. no change in use, egress or occupancy.
Sprinkler work from the 32nd to the 34th floor as plans filed herewith. no change in use, egress, or occupancy.
Combining two units 20a and 20d on the 20th fl, interior renovation, pl work under subsequent filing
Interior office renovation of office space.