Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
installation of suspended scaffold for facade work or inspection . Amendment#1 : added hoist
Modifications to the existing sprinkler system on the (41st floor-Tiger) as per plans. No change to use, egress or occupancy.
Installation of Fence as shown on plans filed herewith.
Modifications to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy.
Filing herewith interior retail renovation. Interior demolition, modification and Installation of non-load-bearing partitions, lighting, floors, ceilings, and doors as per plans. No change to use, egr...
General construction for tenant Slarskey on 32nd marketing floor (31st construction)
Construction of interior partitions, doors and ceiling for new office conference room. New convenience stair as shown on drawings. No change in use, egress or occupancy,
Herewith filing for modifications to the existing sprinkler system on the 7th floor as per plans. no change to use occupancy or egress.
Temporary monorail system as per drawings. monorail system shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application.
Construction of interior partitions, doors and ceiling for new office conference room. New convenience stair as shown on drawings. No change in use, egress or occupancy,
installation of suspended scaffold for facade work or inspection . Amendment#1 : added hoist
Minor renovation to existing restaurant. occupancy calculations. no change of use, egress or occupancy thru this filing.
Mechanical work to include replacement of existing chiller, heat exchanger, and cooling tower along with associated ducts and piping as per plans filed herewith. no change in use, egress, or occupancy...
Pl work in apt 20mn filed in conjunction with dob now gc . no change to use, occupancy or egress.
Filing herewith interior retail renovation. Interior demolition, modification and Installation of non-load-bearing partitions, lighting, floors, ceilings, and doors as per plans. No change to use, egr...
Temporary monorail system as per drawings. monorail system shall comply with ch 33 of the nyc bc. no change in use, occupancy or egress under this application.
General construction for tenant Slarskey on 32nd marketing floor (31st construction)
Installation of Fence as shown on plans filed herewith.
Modifications to the existing sprinkler system on the (41st floor-Tiger) as per plans. No change to use, egress or occupancy.
Work to commercial space at the 1st floor of a 23 story, commercial building. alterations to include interior commercial fit-out work. no change to zoning, use, egress, or occupancy under this applica...