Building Permits in ZIP 10022
Manhattan, NY — 1,641 permits filed recently
1,641 permits
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Structural work in conjunction with Alt-CO as shown on plans.
Removal of interior partitions, doors and ceilings of existing suite as shown on drawings. No change in use, egress or occupancy.
Non-illum. non-advertising accessory wall sign saatva.com. no change of use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Filing herewith renovation of existing office as per plans.
Plumbing fixture work at apartment 5c. No change to use, egress or occupancy.
Plumbing work as shown on plans.
Replace some existing plumbing fixtures with new, and install some new. All as per accompanying plans. No chance in use or occupancy.
Partial 15th floor interior work as per plans filed. no change to use, egress or occupancy.
Removal of existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
renovate apartment 8G, partition, plumbing, electrical work, partial window replacement, no change to use, exits or occupancy
Partial demolition of plumbing fixtures and associated piping as per plans
Removal of exisiting convenience stair and infill of a non essential convenience stair opening at 11th floor
Partial 15th floor interior work as per plans filed. no change to use, egress or occupancy.
Mechanical work on the 15th floor. no change to use, egress or occupancy.
Filing herewith mechanical work as per plans for office renovation.
Interior renovation & combination of existing apts 2c & 2d @ partial 2nd floor, in compliance with tppn 3/97. work to include partition changes and lighting. no change in use, egress or occupancy