Building Permits in ZIP 10021
Manhattan, NY — 775 permits filed recently
775 permits
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed east 70th street front of the building.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the sf from the top of the sh and the penthouse terrace past the main roof wall, around the bulkhead, setbac...
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed east 70th street front of the building.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the sf from the top of the sh and the penthouse terrace past the main roof wall, around the bulkhead, setbac...
Hereby filing for the renovation of unit 12de. no change in use, egress or occupancy.
Installation of temporary storage as per plan. no change in use, egress, or occupancy. the storage is top of the sidewalk shed e at east 70th street elevation.
Filed herewith for plumbing work type in conjunction to m01344484-i1. no change to use, occupancy, or egress.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the sidewalk shed columns front of the building.
Interior renovation of apartment 2c as per plans. no change in use, egress or occupancy.
Initial cd5: inspection & fisp repairs per plans. no change in use, egress or occupancy
Installation of new roof-mounted hvac equipment, condensing units, air handlers, ductwork, fresh air intake and exhaust systems, diffusers, grilles, refrigerant piping, and condensate lines as per pla...
Structural joist repair and new roof dunnage for hvac units associated with interior renovation of existing multi-family townhouse, as per the engineer's plans. there is no change to the use, egress,...
Renovation of an existing five-story multi-family residential townhouse, including replacement and installation of non-load bearing partitions, kitchens, bathroom fixtures, millwork, interior doors, f...
Proposed installation of heavy-duty sidewalk shed and supported scaffold as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no chang...
Installation of material hoist. Amend #1, change hoist location, outrigger detail and added beam detail
Work at apartment 5A on 5th Floor - refurbish kitchen & bath, minor non-load bearing partitions removal, new flooring, new split system hvac unit with exterior unit at terrace and 2 interior wall cart...
Work at apartment 5A on 5th Floor - refurbish kitchen & bath, minor non-load bearing partitions removal, new flooring, new split system hvac unit with exterior unit at terrace and 2 interior wall cart...
Interior renovation of apartment 2c as per plans. no change in use, egress or occupancy.
Proposed installation of heavy-duty sidewalk shed and supported scaffold as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no chang...
Installation of new roof-mounted hvac equipment, condensing units, air handlers, ductwork, fresh air intake and exhaust systems, diffusers, grilles, refrigerant piping, and condensate lines as per pla...