Building Permits in ZIP 10021
Manhattan, NY — 775 permits filed recently
775 permits
Installation of suspended scaffold for facade work or inspection.
Plumbing work proposed for a single family home. No change of use, occupancy or egress.
Suspended scaffold plans for facade repairs and inspections
EOS + X-Ray Replacement: Remove and install new partitions and finishes on partial 5th floor in the existing hospital as per plans filed herewith only. No change to zoning, use, egress, occupancy.
HUB Consultation on 4/22 (under 200 East 75th Street Address). Please assign to HUB examiner. New 18-story building.
HUB Consultation on 4/22 (under 200 East 75th Street Address). Please assign to HUB examiner. New 18-story building.
EOS + X-Ray Replacement: Remove and install new partitions and finishes on partial 5th floor in the existing hospital as per plans filed herewith only. No change to zoning, use, egress, occupancy.
Suspended scaffold plans for facade repairs and inspections
Non-illuminated non-advertising accessory entrance awning approved as per nyc landmark preservation commission docket# 26-04802. no change of use, egress or occupancy.
Plumbing work performed in association with Interior Renovations work done in Apartment Unit 10C. No Change to Use, Egress or Occupancy under this application.
Installation of suspended scaffold during facade inspection / repair and Hoist
Apartment combination of units 7b and 7c filed under tppn 3/97. no change to use, occupancy or egress
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Mechanical work filed in conjunction with apartment#14B renovation.
Herewith filing an application for a temporary tent for a Weill Cornell temporary place of assembly event being used for a temporary public assembly application #: M01372597-I1. No change in use, egre...
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal of non-bearing, non-structural elements only forexisting multi family dwelling. no change in use is proposedunder this application. no exterior work/demo, no excavationwork/demo. no roof work/...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.