Building Permits in ZIP 10020
Manhattan, NY — 170 permits filed recently
170 permits
Alterations to plumbing system on 7th floor terrace as per plans. No change to use, egress or occupancy.
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Mechanical changes as indicated on plans.
Minor interior renovations for exist'g dental office at unit #1807 on 18th floor; no change to use, egress or occupancy
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Minor interior renovations for exist'g dental office at unit #1807 on 18th floor; no change to use, egress or occupancy
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Exterior work only. all work is to be conducted solely on the building exterior for limited repairs.
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Exterior work only. all work is to be conducted solely on the building exterior for limited repairs.
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Filing herewith for Plumbing modifications as per plans. Removal and Installations of plumbing fixtures and associated piping. No change to use, egress or occupancy.
Filing herewith for Plumbing modifications as per plans. Removal and Installations of plumbing fixtures and associated piping. No change to use, egress or occupancy.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Install of temp platform, no alt to exist structures for Ralph Lauren Olympic Sculptures. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All production equipment...
Structural work on 7th floor terrace as per plans. No change to use, egress or occupancy.
Structural work on 7th floor terrace as per plans. No change to use, egress or occupancy.
Alterations to 7th floor terrace as per plans. No change to use, egress or occupancy.