Building Permits in ZIP 10019
Manhattan, NY — 1,289 permits filed recently
1,289 permits
Work to include furnishing and installing sprinkler heads and branch piping and plumbing fixtures and related piping.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Garage repairs at the cellar, first floor, and garage entrance/exit as per plans filed herewith. No change in use, egress, or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Replace illuminated sign on existing marquee (spin)
Facade repairs as per plans. no change in use, egress or occupancy.
Modification the existing sprinkler system on the 17 floor as per plans. No change to use, egress or occupancy
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Fence installation per plans filed herewith. no change to use, egress or occupancy.
Filing to supersede job#M00317659; removal and relocation of plumbing fixtures on first floor apt #1W. Replace plumbing fixtures in apartment units #2W, 4W & 5W
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical - Provide two water-cooled AC units (2 tons each), a couple of fans, ductwork and fire/smoke dampers with smoke detectors. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Removal and installation of plumbing fixtures and related piping. no change to use, egress or occupancy.
Installation and use of temporary sidewalk shed as per plans filed herewith. no change to use, egress or occupancy under this application.
Pulitzer Fountain - civil work including the foundation around the fountain plaza. No change of use, egress or occupancy.
Minor demolition with installation of new partitions on the 34th floor as per plans. No change to Use, Egress or Occupancy.
mechanical modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
Plumbing modifications
general construction on the 11th floor as per plans filed herewith. no changes in use, egress or occupancy.