Building Permits in ZIP 10019
Manhattan, NY — 1,284 permits filed recently
1,284 permits
General construction work to include installation of access platform at 6th floor mechanical room.
Plumbing work filed in conjunction with GC application
General construction work to include installation of access platform at 6th floor mechanical room.
Replace three gas fired boilers.
EES will be built around all exposures adjoining the neighbors/sidewalks. It will be installed at the top 3 floors and work its way down floor by floor to the 2nd FL in progression with demolition.
Plumbing work filed in conjunction with GC application
Installation of temporary working platofrm as per plans. platofrm shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior renovation to apt 2401 only - remove non-load bearing partitions and install new partitions for new bathroom. new plumbing work, finishes and lighting. no change to egress, use or occupancy.
facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Facade Inspection via Industrial Rope Access
Application filed for general construction, repairs and improvements to the Kirkland Chapel and adjacent accessory spaces.
Installation of temporary interior scaffold system stair tower for worker access during construction operations of Alt CO filed under DOB NOW M00940950-I1 and Demolition M009564110-I1. No change in us...
Plumbing work related to the interior renovation of apt. 44-e on the 44th floor. no change to use, egress, or occupancy.
Alt 2. upgrade kitchen and bathroom with new appliances and plumbing fixtures. new wood flooring. no change in use, occupancy or egress.
Plumbing work to apartment 8d as per plans filed herewith. no change to use, egress or occupancy.
Installation and use of temporary overhead protection & supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a temporary work platforms as per plans. no change in use, egress or occupancy under this application. work platforms to comply with 2022 nyc building code, chapter 33
Alt 2. upgrade kitchen and bathroom with new appliances and plumbing fixtures. new wood flooring. no change in use, occupancy or egress.
Installation of temporary interior scaffold system stair tower for worker access during construction operations of Alt CO filed under DOB NOW M00940950-I1 and Demolition M009564110-I1. No change in us...
Installation and use of temporary overhead protection & supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.