Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Renovation of existing atrium space including the 10th avenue lobby, cellar level, escalator ante rooms and skylight. 2nd floor scope includes renovation of the 2nd floor connector corridor and replac...
Installation of new plumbing fixtures and associated piping on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
Subsequent application filed for sprinkler modifications/additions on the 11th fl (suite 1109 - nosova) as per plans filed herewith. no change in use, egress, or occupancy.
This Alteration application is being filed in conjunction with Alt I application #123112041 for the sprinkler work in floors Cellar, Mez 1, 001-008, Roof level. There are no change in u se, egress or...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a new sprinkler system on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy.
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a new sprinkler system on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
This Alteration application is being filed in conjunction with Alt I application #123112041 for the sprinkler work in floors Cellar, Mez 1, 001-008, Roof level. There are no change in u se, egress or...
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Modifications to the existing HVAC system on floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy.
Subsequent application filed for sprinkler modifications/additions on the 11th fl (suite 1109 - nosova) as per plans filed herewith. no change in use, egress, or occupancy.
Interior demolition on partial 5th floor including removal of partitions and finishes in the existing office suite as per plans filed herewith only. No change to zoning, use, egress, or occupancy.
Facade repairs and limited parapet replacement as per plans; no change in use, egress, or occupancy.
Renovation of existing atrium space including the 10th avenue lobby, cellar level, escalator ante rooms and skylight. 2nd floor scope includes renovation of the 2nd floor connector corridor and replac...
Installation of new plumbing fixtures and associated piping on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
Fire alarm: modification of existing system. associated building permit:101072718. affects: 0 dwelling units; 1 non-residential units. high-rise building: yes. voice communication: yes. special lockin...
Installation of suspended scaffold for facade work and/or inspection. Amend #1 added scaffold drop and beam tieback lifeline detail
Filing for interior demo of non-load bearing partitions, floors and ceiling as per plans filed. no change to use egress or occupancy.