Building Permits in ZIP 10019
Manhattan, NY — 1,289 permits filed recently
1,289 permits
Structural modifications on floors 11-15 (CWNY) as per plans. No change to use, egress or occupancy.
Replacement of masonry parapet as per plans. no change to use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes on floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy.
MSW- 4F ENABLING FOR SURGICAL EXPANSION - plumbing modifications of the 4th floor as shown on plans filed herewith. No change in egress, occupancy or use.
Interior demolition of all non load-bearing partitions as shown on the demolition plans. all work to be performed in accordance with applicable nyc dob codes and regulations. no change in use, egress...
Interior demolition of all non load-bearing partitions as shown on the demolition plans. all work to be performed in accordance with applicable nyc dob codes and regulations. no change in use, egress...
Structural modifications on floors 11-15 (CWNY) as per plans. No change to use, egress or occupancy.
EREECT ILLUMINATED ACCESSORY BUSINESS D/F BLADE SIGN-A @7th AVE ELEVATION AS PER DRAWING FILE HEREWITH
Replacement of masonry parapet as per plans. no change to use, egress or occupancy.
Filing herewith for the renovation of an existing first-floor commercial space. Scope of work includes removal and installation of interior non-bearing partitions. No changes to use, egress, or occupa...
Installation of new partitions, doors, ceilings and finishes on floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy.
MSW- 4F ENABLING FOR SURGICAL EXPANSION - plumbing modifications of the 4th floor as shown on plans filed herewith. No change in egress, occupancy or use.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Plumbing and sprinkler modifications to accommodate alterations within the existing building as per plans.
Installation of new plumbing fixtures and associated piping on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Installation of a new sprinkler system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Installation of ventilation system on the first floor as per plans filed. no change to use, egress or occupancy.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy.the custom color sidewalk shed at west 56th street and 5th avenue elevations.
Exterior renovation of facade on the 1st - 5th floors as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the Cellar & 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy