Building Permits in ZIP 10019
Manhattan, NY — 1,284 permits filed recently
1,284 permits
Mechanical work filed in conjunction with ALT1#: 123923068 (No Work) and General Construction application (GC)#: M00461800
Remove existing 4 pipe system serving bedrooms and associated ductwork. Install 2 new 4 pipe Air Handler System along with new ductwork, grilles and thermostats. No change in use, egress or occupancy.
Interior demo of partitions walls and interior renovation of apartment 4j
Installation of temporary adjacent roof protections per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modification of plumbing and sprinkler systems on 7fl as shown on plans. no change of use, egress or occupancy. application filed in conjunction w/ m01195452-i1 (gc) & m01195452-s1 (ms)
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Alteration to create new accessory amenity spaces for the building tenants from portions of the existing 3rd and 4th floor office spaces. scope of work to include general construction inclusive of dem...
Proposed minor modification of existing plumbing and sprinkler system for apartment 55a, no change in use, egress or occupancy.
Interior demo application filed for existing office building. No change in use, occupancy, or egress.
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
Shallow foundation work for concrete caisson under equipment hoists on 57th street side.
Interior renovation and installation of commercial exhaust system for take out pizzeria, no change in use occupancy or egress
Alterations to existing mechancial systems as per plans filed herewith
Removal and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy
Interior renovation of apartment 10x minor demolition of non-load bearing partitions, painting & finishes. no change to use, egress or occupancy. all as per plans and applications.
Facade repairs. scaffold inspections, 3 men letter
Shallow foundation for concrete caisson under equipment hoists on 56th street.
Facade Inspection via Industrial Rope Access as shown on plans
Filing amendment to amend the plans
Facade repairs. scaffold inspections, 3 men letter