Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Conversion from office (b) occupancy to residential (r-2) occupancy pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conver...
Architectural modifications to suites 730 and 2410 as per plans. No change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
General construction work related to the demolition of existing interior partitions. Installation of new furred out layer of gyp. bd. on existing partitions. Repair of existing partitions. No change i...
General Construction to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Exterior Facade repairs per plans filed including: Removal & replacement of masonry units & parapet coping. Masonry repointing. Restoration & reinforcement of existing steel spandrel/lintel.
Heating/cooling and ventilation for the new perimeter area. Outdoor radiant heating for the new terrace area.
New interior office renovation includes new perimeter offices, conference rooms, and reception area.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation and use of temporary supported scaffold equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Conversion from office (b) occupancy to residential (r-2) occupancy pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conver...
Structural work on the cellar level as indicated on drawings.
Propose plumbing work of apartment #14C @ partial 14th floor of existing residential building as per plan. No change in use, egress, or occupancy.
Filing alt-2 for apt 12b,14a/14b,15a,15-i,that encompasses interior removals and renovations of fire damaged building. the work will include repair and replacement of non-load bearing partitions, no c...
Facade repairs on existing building. no change to use, occupancy or egress.
Installation and use of temporary supported scaffold equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
New interior office renovation includes new perimeter offices, conference rooms, and reception area.
Conversion from office (b) occupancy to residential (r-2) occupancy pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conver...
Filing alt-2 for apt 12b,14a/14b,15a,15-i,that encompasses interior removals and renovations of fire damaged building. the work will include repair and replacement of non-load bearing partitions, no c...
Heating/cooling and ventilation for the new perimeter area. Outdoor radiant heating for the new terrace area.