Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Modifications to the existing HVAC system on the 45th floor as per plans. No change to use, egress or occupancy.
Interior fit-out of the entire 5th floor including non-loadbearing partitions. The project includes offices, meeting rooms and support spaces. No change to use, egress or occupancy
Office renovation (tagwall) work to include partitions, ceiling and door modifications as indicated on plans. no change in use, egress or occupancy.
Pulitzer Fountain - civil work including the foundation around the fountain. No change of use, egress or occupancy.
Plumbing work as shown on plans
Installation of temporary construction fence, supported scaffold, and heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o...
Renovation of existing commercial space in partial first floor with general construction: install new partitions, floor/wall finishes. no change in use, egress or occupancy under this application.
Modifications to the existing HVAC system on the 45th floor as per plans. No change to use, egress or occupancy.
general construction on the 18th floor as per plans filed herewith. no changes in use, egress or occupancy.
Interior renovation of apt. 55a with minor demolition. remove & relocate non load bearing partitions & ceilings per plans. no change in egress, occupancy or use is involved under this application.
Interior fit-out of the entire 5th floor including non-loadbearing partitions. The project includes offices, meeting rooms and support spaces. No change to use, egress or occupancy
mechanical modifications on 18th Floor as per plans filed herewith. no changes in use, egress or occupancy.
Modifications to the existing sprinkler system on the 20,21,22,24 Floors- (Orrick Buildout) as per plans. No change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Modification to the existing plumbing system on the 17th floor as per plan. no change to use egress or occupancy
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Work to include furnishing and installing sprinkler heads and branch piping and plumbing fixtures and related piping.
Plumbing modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Minor work in existing commercial office space. Work to include Partitions, flooring, ceilings finishes and fixtures. No change in egress, use or occupancy.
Filing herewith for Temporary Standpipe as per plans (Provided one Temporary Standpipe with compressor and one fire department Siamese connection.