Building Permits in ZIP 10018
Manhattan, NY — 663 permits filed recently
663 permits
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
Install new 4 wc, 4 lavs, 2 floor drains, 2 sinks, 1 dishwasher, 1 hwh non gas, 1 water piping & 1 sanitary piping.
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per approved plans. No change...
Install plumbing fixtures and related piping. new: 6 wc, 6 lavs, 6 sinks, 5 dishwashers, 3 floor drains, 7 hwh non gas, 1 shutoff valve, 1 water piping & 1 sanitary piping.
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Removal of old air conditioning units and replacement with new unit in kind.
Perform mechanical work for an existing 42-story office building, design includes the installation of vrf heating and cooling systems and building exhaust and fresh air system. no change in use, egres...
Install plumbing fixtures and related piping. new: 6 wc, 6 lavs, 6 sinks, 5 dishwashers, 3 floor drains, 7 hwh non gas, 1 shutoff valve, 1 water piping & 1 sanitary piping.
Perform mechanical work for an existing 42-story office building, design includes the installation of vrf heating and cooling systems and building exhaust and fresh air system. no change in use, egres...
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per approved plans. No change...
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Install 189 new sprinkler heads and pipng.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Install 189 new sprinkler heads and pipng.
Remove 155 existing sprinkler heads, install 11 temporary loop heads & install 106 permanent sprinkler heads and piping.
Provide temporary shoring for the repair of roof slab as per plans. no change in use, egress or occupancy.
Modification of air device with ducts, and installation of exhaust fan and radiation.
Mechanical work as per plans to include installation of one water cooled heat pump.
Interior renovations on teh 29th floor as per plans.