Building Permits in ZIP 10014
Manhattan, NY — 1,093 permits filed recently
1,093 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Demolition Sequence & Bracing and Shoring
Convert 3 family 4 story building to 1 family 4 story with PH. New rear extension.
Install replacement gas piping, new hot water heater, & storage tanks as per plans. no change in use, occupancy, or egress.
Structural work in conjunction with Alt CO
Structural work as per plans to include new doorway opening at second framing level of rear facade and installation of new rear moment frame. no change in use, egress or occupancy.
Minor partition work with general carpentry. No change to use, bulk or egress
Interior white box fitout of existing commercial space. new non-loadbearing gwb partitions and finishes. no change in use, egress or occupancy.
SOE in conjunction with M01041803.
Existing sprinkler system to be modified with removal of existing sprinkler heads and addition of new sprinkler heads with related piping work. no change to use occupancy or egress.
Mechanical work in conjunction with Alt CO