Building Permits in ZIP 10014
Manhattan, NY — 1,109 permits filed recently
1,109 permits
Proposed interior renovation and combine two apartments 2A and 2B conforming and in compliance with TTPN 03/97.......No change of use, egress or occupancy.
Replacing the HVAC Units.
Replacing the HVAC Units.
Installation of supported scaffold
Additional new b-2 boiler associated with be replacement # m01224501-i1 as per plans filed herewith. no change in use egress or occupancy.
Filing for exterior facade repair for floors 001-006 as per plans filed herewith. no change in egress, use or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed: demolition and removal of all interior fit out down to sub-surfaces for apartment PHB ( 14th -16th floors). No enlargement proposed and party walls and fire walls to remain in their entirety...
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Application being filed for the interior alteration of an existing 1-family dwelling unit on the 16th floor. No change of use, egress or occupancy.
Installation of sidewalk shed, supported scaffold, construction fence & debris chute as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 2014 b.c.
Removal of Spilt System Condenser on roof, new toilet and dryer exhaust ductwork being installed on floors 14, 15, and 16, and installation of new condensers on 15th floor and Roof. No change in use,...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Erect new awning with copy. no change in use, egress or certificate of occupancy.
Installation of supported scaffold
Proposed interior renovation and combine two apartments 2A and 2B conforming and in compliance with TTPN 03/97.......No change of use, egress or occupancy.
Plumbing work in conjunction with alteration #M01178200
Application being filed for the interior alteration of an existing 1-family dwelling unit on the 16th floor. No change of use, egress or occupancy.
Proposed: demolition and removal of all interior fit out down to sub-surfaces for apartment PHB ( 14th -16th floors). No enlargement proposed and party walls and fire walls to remain in their entirety...