Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
Interior renovation of apartment unit #3, on 3rd floor only, consisting of partitions, gwb, tile work, window replacement in existing masonry openings, and cosmetic finishes as indicated in drawings....
Installation of new demising wall in existing retail space only. There is no demolition work under this application.
Mechanical work filed in conjunction with interior renovation to 8th floor offices. install new vrf condenser on roof, and 4 evaporators on the 8th floor, associated ductwork and diffusers.
Installation of new gas-fireplace in the Great Room on PH Unit 610 on the 6th floor and extend the venting to the 7th floor terrace.
Minor interior renovation inside residential unit on 3rd floor. add 2 closets per filled plan. no change in use occupancy or egress
To Legalize Existing conditions of a Sign Structure, original Sign Structure filed under application 102818756 no change in use, egress or occupancy
Filing herewith for interior fit-out of the 10th floor as per plans filed herewith.
RENOVATE A PORTION OF EXISTING 8TH FLOOR COMMERCIAL OFFICE SPACE. COMBINE 8th FLOOR SOUTH OFFICE SPACE WITH 8th FLOOR NORTH OFFICE SPACE OCCUPIED BY A SINGLE TENANT. CONSTRUCT NEW PARTITIONS AND FINIS...
Installation of suspended scaffold for facade work or inspection.
Install fire sprinkler system as per plans.
Installation of new gas-fireplace in the Great Room on PH Unit 610 on the 6th floor and extend the venting to the 7th floor terrace.
RENOVATE A PORTION OF EXISTING 8TH FLOOR COMMERCIAL OFFICE SPACE. COMBINE 8th FLOOR SOUTH OFFICE SPACE WITH 8th FLOOR NORTH OFFICE SPACE OCCUPIED BY A SINGLE TENANT. CONSTRUCT NEW PARTITIONS AND FINIS...
Mechanical work filed in conjunction with interior renovation to 8th floor offices. install new vrf condenser on roof, and 4 evaporators on the 8th floor, associated ductwork and diffusers.
To Legalize Existing conditions of a Sign Structure, original Sign Structure filed under application 102818756 no change in use, egress or occupancy
Filing herewith for interior fit-out of the 10th floor as per plans filed herewith.
Installation of suspended scaffold for facade work or inspection.
Minor interior renovation inside residential unit on 3rd floor. add 2 closets per filled plan. no change in use occupancy or egress
Renovation work for Cellar & 001 Floor. No change of use, occupancy or egress.
Interior construction work as shown on plans filed herewith. No change in use, egress, and occupancy.
Illuminated non-advertising accessory wall sign - joe & the juice. no change of use, egress or occupancy.