Building Permits in ZIP 10013
Manhattan, NY — 1,012 permits filed recently
1,012 permits
Proposed interior renovation of existing 2nd, 3rd, 4th & 5th floor. no change in egress, use or occupancy.
Filing for plumbing and sprinkler work as per plans submitted herewith. no change to use, egress, or occupancy.
Install new wood framing and subflooring at each level of the interior elevator shaft. Elevator equipment was removed and the shaft abandoned by others on applications M00858075, and M01166935.
Interior renovation of the commerical space in cellar. no chngae of use, occupancy or egress
General construction and Mechanical work as indicated on the plans for work on lower duplex apt 5R
Interior renovation of the commerical space in cellar. no chngae of use, occupancy or egress
Remove 5 non-illuminated advertising/awning/business signs in order to remedy ECB violation number 39171958H. No change in egress, occupancy or use is involved under this application.
Filing for interior renovation for bce nexxia 23rd floor office with associated minor demo on terrace related to hvac unit removal as per plans submitted herewith. no change to use, egress, or occupan...
Gut renovation to apartments located on the 7th -9th floors and two levels of rooftop terraces. relocation of non-load bearing interior partitions. install new exterior lighting. refurbish pool. no ch...
File suspended scaffold outrigger systems for facade restoration and inspection.
Installation and use of temporary articulating boom crane as per plans filed herewith. no change in use, egress, or occupancy.
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing application filed for restaurant and bakery tenant fit out. No change in use, egress or occupancy.
Sprinkler application filed for restaurant and bakery tenant fit out. No change in use, egress or occupancy.
first renewal for SR 23/1815 -- transfer of old method paper submission to DOB NOW filing M01002049 to perform facade inspections and work
first renewal for SR 23/1815 -- transfer of old method paper submission to DOB NOW filing M01002049 to perform facade inspections and work
Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of pipe scaffolding, overhead protection, and roof protection as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this...
File suspended scaffold outrigger systems for facade restoration and inspection.
Plumbing application filed for restaurant and bakery tenant fit out. No change in use, egress or occupancy.