Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
Replacement of existing boiler in existing boiler room in cellar in conjunction with restaurant renovation in cellar & first floor.
INTERIOR RENOVATION OF APT 8 ON 3rd FL. AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.MECHANICAL AND PLUMBING WORK FILED UNDER SEPARATE APPLICATION
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Mechanical work as shown on plans filed herewith. No change in use, occupancy, or egress.
Window removal and replacement. through wall ac sleeve removal and infill, new mechanical shafts. new 13th fl solarium as per plans filed herewith. no change in use, egress or occupancy.
Filing for the plumbing work in conjunction with the apartment renovation of unit 3. No change to use, egress, or occupancy.
Plumbing scope of work in-conjunction with general construction interior renovation application. no change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Proposed plumbing work in conjunction to the arch. designs, provide installation of fixtures as indicated throughout the set for a tenant fit-out. no change in use, egress and occupancy
Mechanical modifications related to exsiting restaurant renovation including the addition of new commercial kitchen exhaust and makeup air as per drawings filed herewith.
Fiing herewith for the new and relocated sprinkler heads and piping inconjunction with renovation. connection to existing base-buildingplumbing risers.
Structural modifications related to renovation of existing restaturant at ground level as per drawings filed herewith.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Mechanical modifications taking place on the 6-7th floors as indicated on the drawings.
General construction to include the renovation of an existing restaurant as per drawings filed herewith.
Interior renovation at 3rd- 5th floors as per plans filed herewith
Construction modifications taking place on the 3-4th & 6-7th floors as indicated on the drawings.
Storefront replacement related to restaurant renovation as per drawings filed herewith. no change in use, egress or occupancy
Interior demoliton of non-load bearing interior partitions, and related fixtures on first floor
Mechanical modifications to commercial space as per plans. no change to use, egress or occupancy.