Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
Interior renovation to include demolition of existing and construction of new partitions in suite 1610 for existing office space. No change in use, egress, or occupancy.
Contractor to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel reinforcement, placing and curing cast-in-place concrete a...
Modifications of existing plumbing and sprinkler systems to include fixture and sprinkler head installation. no change to use, occupancy or egress
Providing exhaust air in the underground electrical vault, interlocked with the light switch, to purge 6 air changes per hour (ACH) upon entry to the vault. Dehumidification and heating will be provid...
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 codeno change in use, egress, or occupancy under this application. the sidewalk shed at broo...
Mechanical modifications of the existing system. Associated ducts and piping, and relocation of the existing AC unit. No change to use, egress or occupancy.
Proposed Alteration for the Mechanical work in conjunction with general GC DOB#M0113989-I1 for the renovation of a residential unit on the 5th Floor of a 6-story mixed-use building. No change in use,...
Plumbing work as per proposed plans submitted.
Filing to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel reinforcement, placing and curing cast-in-place concrete and s...
Underpinning work as per plans filed.
Installation of temporary needle beam as per plan. no change in use,egress or occupancy
Installation of temporary construction plywood fence as per plan. no change in use, egress or occupancy.
Filing for interior demo of 24th & 25th floor offices as per plans submitted herewith. no change to use, egress, or occupancy.
Filing herewith for Plumbing modifications to the existing system and associated piping as per plans. No change to use, egress or occupancy.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Filing for mechanical work associated with interior demo of 24th & 25th floor offices as per plans submitted herewith. no change to use, egress, or occupancy.
Installation of split hvac mechanical system within existing apartment unit 5d & new rooftop condenser. no change in use, egress or occupancy.
Construction equipment - scaffold proposed installation of pipe scaffold for remedial repairs as per plans. pipe scaffold shall comply with chapter#33 of 2014 the ny building code. no change in use oc...
Filing for plumbing and sprinkler work as per plans submitted herewith. no change to use, egress, or occupancy.
FILING FOR PLUMBING AND SPRINKLER WORK ASSOCIATED WITH THE 23RD FLOOR BCE Nexxia AS PER PLANS SUBMITTED HEREWITH.