Building Permits in ZIP 10013
Manhattan, NY — 1,024 permits filed recently
1,024 permits
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
New plumbing fixtures in 1st floor commercial space. in conjunction with renovations filed under m01056101-i1.
Herewith filing for structural modifications in conjunction with lobby renovations per plans. no change in use, occupancy or egress under this application.
General construction for limited exterior repairs on north, south east, west elevations & roof as per plans filed herewith. no change in use, egress or occupancy.
INSTALLATION OF HEAVY DUTY SIDEWALK SHED and pipe scaffolding. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Sprinkler/Standpipe worktype in conjunction with Alt I application 122193223. NEW COMBINATION SPRINKLER STANDPIPE SYSTEM. SPRINKLER PREVIOUSLY FILED AND APPROVED UNDER- Alt 1 (122193223-02)
Installation of heavy-duty sidewalk shed for minor re-pointing as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc bui...
Plumbing work as shown on plans
Mechanical work for office fit out for Croud on 9th floor
General construction for office fit out for Croud on 9th floor
Installation of IRA for facade inspection.
Subsequent filing for structural work in conjunction with alteration (GC) filing
Structural work for alteration as per plans filed.
Application filed for sprinkler additions/modifications on floors 003 thru 007 as per plans filed herewith. no change in use, egress or occupancy.
Application filed for mechanical additions/modifications on floors 003 thru 007 as per plans filed herewith. no change in use, egress or occupancy.
Plumbing scope of work in-conjunction with general construction interior renovation application. no change to use, egress or occupancy
Mechanical work for office fit out for Croud on 9th floor
Structural work for alteration as per plans filed.
Application filed for sprinkler additions/modifications on floors 003 thru 007 as per plans filed herewith. no change in use, egress or occupancy.