Building Permits in ZIP 10013
Manhattan, NY — 1,012 permits filed recently
1,012 permits
Structural work for roof pergola and deck as per plans. no change of use, egress or occupancy under this application.
Installation of AC units taking place on the roof as indicated on the drawings.
Filing for the interior demo of an existing commercial space at floors 1 thru 3, mezzanine. Work includes removal of interior non load bearing partitions, finish work. No change to use, egress, or occ...
Application file to exterior facade repair as stucco work in front of building. no change in use, egress or occupancy under this application.
Installation of AC units taking place on the roof as indicated on the drawings.
Installation of one split heat pump system ac units for 1st floor commerical space.
Renovation to tenant spaces at Cellar-1st Floor-12th Floor and Roof as per plans.
Modification to & additions to mechanical systems as per plans.
Structural work for roof pergola and deck as per plans. no change of use, egress or occupancy under this application.
Filing for the interior demo of an existing commercial space at floors 1 thru 3, mezzanine. Work includes removal of interior non load bearing partitions, finish work. No change to use, egress, or occ...
In Apt. 6C propose to relocate kitchen, create laundry room, erect non-bearing partitions and change non-bearing partition in master bathroom. No change in bathrooms fixture layouts. No change in use,...
Suspended Scaffold for Painting as Shown on Plans
Filing herewith redesign of non egress stair as shown on plans,
New sprinklers to replace existing sprinkler. connect to existing sprinkler riser. no changes to exterior
Suspended Scaffold for Painting as Shown on Plans
New sprinklers to replace existing sprinkler. connect to existing sprinkler riser. no changes to exterior
Filing herewith redesign of non egress stair as shown on plans,
In Apt. 6C propose to relocate kitchen, create laundry room, erect non-bearing partitions and change non-bearing partition in master bathroom. No change in bathrooms fixture layouts. No change in use,...
Install wall hung direct vent gas boiler in existing 6th floor mechanical room. no change in use, occupancy or egress
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.