Building Permits in ZIP 10013
Manhattan, NY — 1,015 permits filed recently
1,015 permits
Proposed interior non-bearing renovation, with minor partitions and finish work at 03 and 14 floor as per plan. no change in use, egress and occupancy.
Installation of 300 psf sidewalk shed and pipe scaffold as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Plumbing Work for Roof
Interior renovation of existing apartment at first floor. no change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of new hvac systems & ventilations systems along w/ associated ductwork & piping as indicated on the drawings filed herein.
Hereby filing mechanical work for interior tenant renovation for restaurant buildout as shown on plans filed herewith. No change to use, egress or occupancy
Proposed mechanical work in conjunction to arch. designs. no change in use, egress and occupancy.
Plumbing work is proposed in existing unit #2 on the 2nd floor. Subsequent GC, MH, SP, and exterior applications will be filed. All per submitted plans. No changes to use, egress, or occupancy under t...
Interior renovation of mechanical systems as shown on filed plans
Mechanical Work on 4th and 5th Floor
Mechanical work on Roof
Propose plumbing work of existing mixed commercial and residential building on mezzanine as per plan. No change in use, egress, or occupancy.
Interior Alteration of 1st FL retail space (Barber Shop), No change in use, occupancy, or egress.
Installation of new roof framing for a roof terrace. no change in use, occupancy or egress.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
General Construction as shown on plans filed herewith. No change to use egress or occupancy.
Installation of temporary pipe & system scaffold as per plans. no change in use, egress or occupancy.
Mechanical Work as shown on plans. No change to use, egress or occupancy.
Temporary standpipe modification to the the cellar as per plans filed herewith. no change in use, egress.