Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
Plumbing and Sprinkler work filed in conjunction with OT application to renovate unit 7E.
Remove the existing non illuminated accessary business sign on wall. The sign has a 27 s.f. in size and showing Serina P.S. Cheung, DDS PC + 114 Bowery. This job is also filed to withdraw the old job...
Filed for minor interior renovations of kitchen and bathrooms at first floor apartment.
Repair the cracked interior brick wall on 1st FL and at the cellar brick wall opening as shown on plans. Also, the purpose of this filing is to obtain authorization for the Partial Stop Work Order lif...
Pointing as per plan. no change in use, egress or occupancy with this application
replace oil boiler with a new gas boiler in cellar, file in conjunction with plumbing Job#M01122840-I1, mechanical and construction job#M01122840-S1. No change in use, occupancy or egress. filed in co...
Remove the existing non illuminated accessary business sign on wall. The sign has a 27 s.f. in size and showing Serina P.S. Cheung, DDS PC + 114 Bowery. This job is also filed to withdraw the old job...
replace oil boiler with a new gas boiler in cellar, file in conjunction with plumbing Job#M01122840-I1, mechanical and construction job#M01122840-S1. No change in use, occupancy or egress. filed in co...
Pointing as per plan. no change in use, egress or occupancy with this application
Plumbing and Sprinkler work filed in conjunction with OT application to renovate unit 7E.
Filed for minor interior renovations of kitchen and bathrooms at first floor apartment.
Interior renovation of existing retail space including new millwork along with floor & wall finishes as per the drawings filed herein. no change to the use, occupancy or egress under this application.
Support of excavation filed in conjunction with nb job number m01243425-i1.
Erect new awning at osp. no change in use, egress or certificate of occupancy.
Filing for sprinkler work associated with interior demo of 24th & 25th floors as per plans submitted herewith. no change to use, egress, or occupancy.
Sprinkler work filed in conjunction with the renovation of apartment 6G. Architectural, mechanical and plumbing work filed separately. No change of use, occupancy or egress.
Combination and renovation of apartment #4N& PH-N at the 4th and 5th Floor.
Mechanical work file in conjunction of apartment combination and renovation
Interior renovation of existing retail space including new millwork along with floor & wall finishes as per the drawings filed herein. no change to the use, occupancy or egress under this application.
Combination and renovation of apartment #4N& PH-N at the 4th and 5th Floor.