Building Permits in ZIP 10013
Manhattan, NY — 1,006 permits filed recently
1,006 permits
Plumbing work in apt 11d as per plans. no change in use, occupancy, or egress.
Rope access installation for rear facade access and inspections
Roof replacement as per plans.
Parapet replacement as per plans.
Installation of Emergency sidewalk shed as per AC -28-105.4.1 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application...
Interior renovation of apt 2re. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Removal of sidewalk, curbs, asphalt pavement, utilities and site preparation. Excavation and installation of sewers and utilities and curbing, sidewalk, and asphalt pavement.
Mechanical duct work in conjunction with new bathroom addition
Proposed interior renovation works on 1st floor as shown on plans. the plumbing, mechanical, and structural work type shall be done under separate subsequent applications.
Blank street-- plumbing modifications and installations related to cafe build out.
New installation & relocation of plumbing fixtures in conjunction with the interior commercial renovation filed under gc #m01298154-i1
Renovation of existing unit PHA to include removal & installation of partitions and stair. No change in use, egress, or occupancy
Installation of sidewalk shed as indication the attached drawings. There are no changes in use, egress or occupancy.
Mechanical work as per plans filed herewith. no change to use, egress or occupancy
Removal of existing convenience stair work to also include patch and repair of ceiling and floor finishes as indicated on plans. no change in use, egres or ocupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work in apt 8b as per plans. no change in use, occupancy, or egress.
Plumbing work in apt 10g as per plans. no change in use, occupancy, or egress.
Modifying HVAC system to serve new configuration as per plans. No change in use, egress or occupancy.