Interior and exterior renovation on the 6th floor, mezzanine, penthouse and roof per plans filed herewith. No change in use, egress or occupancy.
Interior removal at 6th floor and penthouse. no change in use, egress or occupancy.
Proposed structural work to install steel lintel, no change in use, egress and occupancy.
Interior renovation of existing retail space. No change to use, egress, or occupancy.
Mechanical modifications taking place on 4th & 5th floors as per plans filed herewith. no change in use, egress, or occupancy.
IRA Facade Inspection
Resolution of existing ecb violation#39137421z of extension for commercial area at 1st floor. convert rear fire escape into fire balcony. construction work as per plan.
filing herewith general construction to include interior renovation and minor interior demo to existing apartment as per plans.
General construction taking place on 4th & 5th floors as per plans filed herewith. no change in use, egress, or occupancy.
filing herewith general construction to include interior renovation and minor interior demo to existing apartment as per plans.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior renovation of existing retail space. No change to use, egress, or occupancy.
Resolution of existing ecb violation#39137421z of extension for commercial area at 1st floor. convert rear fire escape into fire balcony. construction work as per plan.
Mechanical modifications taking place on 4th & 5th floors as per plans filed herewith. no change in use, egress, or occupancy.
IRA Facade Inspection
Installation of a combined fire protection water service with domestic water takeoff, new sanitary, vent, domestic water, stormwater, and gas pipping appliances. No change to use, egress or occupancy...
Suspended scaffold installation for local law repairs and inspection
Plumbing work to add new powder room to retail space. No change to use, egress or occupancy.
Relocate and install sprinkler heads on the cellar level, 1st floor through 5th floor, and penthouse as per plans submitted herewith. There are no change to use, egress or occupancy.
Suspended scaffold installation for local law repairs and inspection