Building Permits in ZIP 10012
Manhattan, NY — 715 permits filed recently
715 permits
Interior renovation of apartment. Removal and erection of non-load bearing partitions, finishes, millwork, painting and sanding work. All as per plans and applications. No change in use, egress or occ...
Modification to existing plumbing system on 2nd floor as per plans filed herewith. No change in use, egress, or occupancy.
Renovate existing apartment ph1 on the 6th floor; work to include removing and installing non-bearing partition work and finishes. no change to use, egress or occupancy.
Renovate existing apartment ph1 on the 6th floor; work to include removing and installing non-bearing partition work and finishes. no change to use, egress or occupancy.
Interior renovation of apartment. Removal and erection of non-load bearing partitions, finishes, millwork, painting and sanding work. All as per plans and applications. No change in use, egress or occ...
Modification to existing plumbing system on 2nd floor as per plans filed herewith. No change in use, egress, or occupancy.
General construction proposed in triplex unit #2A on the cellar, 1st, and 2nd floors. Subsequent plumbing application to be filed. All per submitted plans. No changes to use, egress, or occupancy.
Filing for mechanical work at the 6th floor, 6th floor mezzanine, and roof. No change to use, egress, or occupancy.
Suspended Scaffold for Painting as Shown on Plans
Suspended Scaffold for Painting as shown on Plans
Suspended Scaffold for Painting as shown on Plans
Filing for mechanical work at the 6th floor, 6th floor mezzanine, and roof. No change to use, egress, or occupancy.
Suspended Scaffold for Painting as Shown on Plans
Install permanent chain-link fence inside property line on vacant lot as per plans.
Install permanent chain-link fence inside property line on vacant lot as per plans.
Install permanent chain-link fence inside property line on vacant lot as per plans.
Install permanent chain-link fence inside property line on vacant lot as per plans.
Interior plumbing work in a commercial space - as per plans. .no change in use, egress or occupancy
Renovation of an existing dunkin including general construction work type on the cellar and first floor as per plans submitted herewith, no change in use, egress or occupancy group.
Install permanent chain-link fence inside property line on vacant lot as per plans.