Building Permits in ZIP 10011
Manhattan, NY — 1,105 permits filed recently
1,105 permits
2nd street-- mechanical modifications and installations for retail buildout.
2nd street-- modifications to existing sprinkler system in conjunction with retail build out. no change to use, egress, or occupancy.
Kohne hall - removal and installation of interior partitions for reconfiguration of student lounge, removal of closets in dormitory rooms, and patching floor at wall removal no change in use, egress o...
Installation of plumbing fixtures
Filing for change of use in cellar and 1st floor to show daycare. interior renovation of daycare space on cellar and first floors including but not limited to interior non-load bearing partitions and...
IRA to assist with Condition Assessment.
Sidewalk Vault Repair as per plans filed herewith. No Change to use, egress or occupancy
Repair existing front facade as required. no change in use, egress, or occupancy under this filing.
New pl fxt @ new roughing (2 hwh) @ cellar; (2 dw, 2 sink, 4 wc, 3 shower, 4 lav) @ 1st; (2 tub, 2 shower, 4 lav, 4 wc, 2 sink, 2 dw, 2 w/m) @ 2nd; (2 tub, 2 shower, 4 lav, 4 wc, 2 sink, 2 dw, 2 w/m)...
Install new split unit system to 1st thru 4th floor and roof. no change in use, egress, or occupancy under this filing.
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Additions/Modifications to existing sprinkler system. No change to use, egress, or occupancy.
Mechanical work as shown on plans.
Plumbing updates for new five iron golf at cellar & 1st floor tenant space as per plans filed herewith.
Sprinkler updates for new five iron golf at cellar & 1st floor tenant space as per plans filed herewith.
Install 2 non-residential sinks, 2 hand sinks, 1 ice-maker.
Mechanical work to include duct work associated with commercial sauna as shown on plans
Mechanical work as shown on plans
Tenant interior and exterior alterations at cellar and first floor. No change to use, egress or occupancy.
Install 2 non-residential sinks, 2 hand sinks, 1 ice-maker.