Building Permits in ZIP 10011
Manhattan, NY — 1,115 permits filed recently
1,115 permits
Kohne hall - modification of hvac.
Installation of a temporary engineered enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work in conjunction with interior renovation to Apt. #15 on the 2nd floor. Changes to plumbing fixtures, as per plans. No change in use, egress, or occupancy under this application.
Lorillard hall - modification of hvac.
Exterior facade repairs and reconstructions as necessary and per plans submitted. No change in use, occupancy or egress proposed under this application.
White hall - removal and installation of interior partitions. no change in use, egress or occupancy.
Replacement of lighting in existing ceilings as per drawings filed herewith. No change in use, egress, or occupancy.
Plumbing work in conjunction with the interior renovation of apartment 2j located on the second floor. the gas meter at cellar shall be shut off by the utility company. no change in use, occupancy, or...
Installation of suspended scaffolds for facade repair and inspection.
Portion of existing slab to be partially removed for new HSS installation, remove existing curb, new concrete flood curb, new CMU curb.
Interior alterations of existing 7th floor commercial office space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Interior alterations of existing 7th floor commercial office space to include non-load bearing demo, partition and finishes work. no change to use, occupancy or egress
Installation of suspended scaffolds for facade repair and inspection.
Plumbing work in conjunction with the interior renovation of apartment 2j located on the second floor. the gas meter at cellar shall be shut off by the utility company. no change in use, occupancy, or...
Portion of existing slab to be partially removed for new HSS installation, remove existing curb, new concrete flood curb, new CMU curb.
Replacement of lighting in existing ceilings as per drawings filed herewith. No change in use, egress, or occupancy.
Installation of new non-bearing partitions, new office front and doors, installation of new ceiling and finish as per drawings filed herewith. no change in use, egress or occupancy.
General construction modifications taking place on the 3rd floor as per drawings filed herewith. no change in use, egress or occupancy.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.