Building Permits in ZIP 10011
Manhattan, NY — 1,115 permits filed recently
1,115 permits
Connect to existing gas piping for replacement boiler and gas burner as per plans. no change in use, egress or occupancy.
Interior alterations to existing residential space to include conversion of a bedroom to a bathroom. no change to use, occupancy or egress
Seabury hall - removal and installation of interior partitons and finishes. new elevator shaft walls. no change in use, egress or occupancy.
Modifications to existing 7th floor mechanical systems. no change to use, occupancy or egress
Plumbing work related to the interior combination and renovation of apartment 4gh on the fourth floor as per tppn 3/97. no change to use, egress, or occupancy.
Plumbing work as per plans
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Replacement of glass railings on 10th and 12th floor terraces to respond and resolve vate order and violation #07252325ll011do3. no change in use, egress, or occupancy.
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added scaffold drops and anchor tr1
The barricade with chain link fenc is at west 20th st on the road and west 21st st on the road to be installed on the roadway and shall be permitted at dot. no change in use, occupancy, or egress unde...
Modify existing Sprinkler head layout as part of renovation for tenant spaces at 11th floor of existing commercial space. No change to use, egress or occupancy.
The plywood fence at west 20th street and the chain link fence at the back of the building in the court yard,
Hereby filing for the installation of plumbing fixtures. no change to use occupancy or egress.
Replacement of glass railings on 10th and 12th floor terraces to respond and resolve vate order and violation #07252325ll011do3. no change in use, egress, or occupancy.
Modify existing Sprinkler head layout as part of renovation for tenant spaces at 11th floor of existing commercial space. No change to use, egress or occupancy.
Plumbing work as per plans
The plywood fence at west 20th street and the chain link fence at the back of the building in the court yard,
Modifications to existing 7th floor mechanical systems. no change to use, occupancy or egress
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Hereby filing for the installation of plumbing fixtures. no change to use occupancy or egress.