Building Permits in ZIP 10011
Manhattan, NY — 1,115 permits filed recently
1,115 permits
Installation of mechanical duct work in commercial spaces on first and second floors and new roof top mechanical units on existing steel dunnage using existing rooftop penetrations. No change in occup...
Kohne hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
Edson hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
modification to systems as required to accommodate new tenant fitout
Installation of a heavy duty sidewalk shed to include storage.
White hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
modification to systems as required to accommodate new tenant fitout
Dodge hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
Installation of mechanical duct work in commercial spaces on first and second floors and new roof top mechanical units on existing steel dunnage using existing rooftop penetrations. No change in occup...
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Construction of steel dunnage framing for proposed roof top units. application filed in conjunction with m01260395-i1 (gc), m01327973-i1 (pl) and m01327873-s1 (ms).
Installation of a heavy duty sidewalk shed to include storage.
Propose new illuminated signages for existing commercial space. no change to use, egress or occupancy.
Kohne hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
Conversion of first and second floors from retail use to eating and drinking Occupancy Croup A-2 and obtaning Certifiacte of Occupancy for same.
General construction & structural work for existing cellar joist repairs and temporary bracing during repairs as per plans filed herewith. no change in use, egress or occupancy. all work in cellar onl...
Edson hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egress or occupancy.
Intallation of new steel members as required to infill opening with new metal deck at second floor and install new steel dunnage connected to existing steel dunnage and parapet at roof level. No chang...
Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
General construction on the cellar, 1st to 4th floor and roof as plans filed herewith. no change in use, egress, or occupancy.