Building Permits in ZIP 10011
Manhattan, NY — 1,106 permits filed recently
1,106 permits
Installation of suspended scaffold for facade work or inspection.
Filing for installation of HVAC units in Cellar and associated ducts and piping throughout Cellar to Floor 8 for future fit-out connections as per plans filed herewith. No change in use, egress, or oc...
Application filed for temporary structure. Non habitable rooftop mockup solely for review & approval by the LPC .No change in use, egress or occupancy.
Minor interior renovations to existing Class A apartment 10HW on the 9th floor of an existing mixed-use building. Scope includes selective demolition of non-load-bearing walls, installation of non-loa...
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Interior renovation of existing Apt. 4A, as per plans. No change to Use, Occupancy, or Egress.
basement unit #1 interior renovation
Addition of a dedicated reclamation room exhaust system as per plans filed herewith. No change in use, egress or occupancy under this application.
Partial interior renovation of unit THA at the first floor, installation of non-loadbearing partitions as shown in plans. No change to egress, use, or occupancy.
Facade repair, masonry and railing replacement, concrete patching, lintel replacement as per plans filed. No change in use egress of occupancy.
It is proposed to modify existing sprinkler system as shown on plans. no change of use, egress or occupancy. application filed in conjunction with m01257557-i1 (gc), m01257557-s1 (ms), and m01257557-s...
Temporary Installation in Auditorium at 3RD FL to be removed after event
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Plumbing work for eating and drinking establishment at first floor of existing 5-story with cellar building
Propose interior renovation on 6th floor appartment, works includes minor partitions, andfinish works as per plan. no change in use, egress, and occupancy.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Suspended Scaffold and hoist installation as per plans filed herewith.
Plumbing work for eating and drinking establishment at first floor of existing 5-story with cellar building
Temporary Installation in Auditorium at 3RD FL to be removed after event
Partial interior renovation of unit THA at the first floor, installation of non-loadbearing partitions as shown in plans. No change to egress, use, or occupancy.