Building Permits in ZIP 10011
Manhattan, NY — 1,115 permits filed recently
1,115 permits
General construction for new laundry room as accessory use for existing Pier 61 Banquet Hall
Installation of temporary pipe scaffold as per plan. no change in use,egress or occupancy.
Installation of temporary roof protection as per plan. no change in use,egress or occupancy.
Installation of outrigger for facade repair & inspection.
Structural work for new laundry room for Pier 61 Banquet Hall
Filing for installation of sprinkler heads and related piping as per plans. Filing for installation of water/sanitary plumbing fixtures and related piping as per plans. No change in use, egress, or oc...
Mechanical work at roof, inner courtyard facade, and apartments 5, 11, 13, 14, 18, 23, 26 as per plans filed herewith
General construction for new laundry room as accessory use for existing Pier 61 Banquet Hall
Sherred hall - modifying the existing wood roof trusses tosupport proposed mechanical equipment. additional work includes wood framing, steelframing and lintels, and slab on metal deck
Installation of outrigger for facade repair & inspection.
Structural work for new laundry room for Pier 61 Banquet Hall
Mechanical work for the fit out of an apartment as per plans filed herewith. no change in use, egress, oroccupancy.
Installation of temporary pipe scaffold as per plan. no change in use,egress or occupancy.
Installation of temporary roof protection as per plan. no change in use,egress or occupancy.
Installation of temporary overhead protection / sidewalk shed as per plan. no change in use, egress or occupancy
Installation of temporary heavy duty sidewalk shed as per emergency letter. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300ps...
Filing for installation of sprinkler heads and related piping as per plans. Filing for installation of water/sanitary plumbing fixtures and related piping as per plans. No change in use, egress, or oc...
Filing for interior structural modifications to framing between Cellar and 1st Floor for MEP support. New concrete pads for MEP equipment in Cellar. No change in use, egress, or occupancy in this appl...
New low temperature hot water scope for future areas. new piping connections to be made on upper floors within the building, under seperate application. there is no change in use, egress or occupancy...
Plumbing work bathroom and laundry as shown on drawings submitted herewith.