File for interior demolition only for a multi-story single family residential building. all interior non load-bearing partitions and elements to be removed as per demolition plans.
Plumbing work as shown on plans (Penthouse 26 / PH 26).
Cap and remove 1 electric range, 1 sink, 1 tub, 1 lav, 1 wc to resolve violation # 35485319H.
Sherred hall - facade restoration including localized brick and brownstone masonry repairs, fire escape paint maintenance, gutter, and leader maintenance, stained and leaded-glass window restoration....
Proposed temporary shoring, facade straps installation, & probes., as per plans submitted hetrewith. there is no change in use, egress or occupancy.
Subsequent filing for plumbing work on cellar, 1st thru 3rd floors, in conjunction with alt1 application #m00814190-i1.
Plumbing work as shown on plans (Penthouse 26 / PH 26).
Install exterior non-illuminated wall sign (national museum of mathematics)
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of nyc code 2022. no change in use, occupancy or egress under this application.
Sherred hall - facade restoration including localized brick and brownstone masonry repairs, fire escape paint maintenance, gutter, and leader maintenance, stained and leaded-glass window restoration....
Proposed temporary shoring, facade straps installation, & probes., as per plans submitted hetrewith. there is no change in use, egress or occupancy.
File for interior demolition only for a multi-story single family residential building. all interior non load-bearing partitions and elements to be removed as per demolition plans.
Construction Fence Filing
Cap and remove 1 electric range, 1 sink, 1 tub, 1 lav, 1 wc to resolve violation # 35485319H.
Application to file additional facade repairs, and existing window repairs. no change in use, occupancy or egress.
Equipment use: single 7000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Slab opening on the 1st floor and reinforcing a section of an existing block wall adjacent to this opening at the cellar level as per plans filed herewith. No change in use, egress or occupancy under...
Installation of temporary ramp per plan. no change in use, egress, or occupancy
Installation of temporary ramp per plan. no change in use, egress, or occupancy
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.