Illuminated non-advertising accessory wall sign - stk. no change of use, egress or occupancy.
Installation of (1) outdoor condenser unit and (5) indoor air handling units for a split hvac system, including ductwork, diffusers, condensate drains, refrigeration piping with insulation, and flexib...
Installation of a temporary plywood enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Plumbing and sprinkler work in conjunction with the renovation of the apartment on plans filed herewith. no change in use, egress or occupancy (5th floor)
Construction work on the cellar and 1st floor (landlord retail/lower level work) as indicated on drawings.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Facade repair
New plumbing fixture per plan for existing commercial space. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Construction work on the cellar and 1st floor (landlord retail/lower level work) as indicated on drawings.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Facade repair
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
New plumbing fixture per plan for existing commercial space. no change in use, egress, or occupancy.
ERIOR RENOVATION OF UNIT 2E INCLUDING REMOVAL OF NON-LOAD-BEARING INTERIOR PARTITIONS IN THE KITCHEN AREA AND INSTALLATION OF NEW STEPS LEADING TO THE SUNKEN LIVING ROOM, installing new split HVAC as...
Install an internally illuminated accessory business wall sign on raceway jet set modern pilates
Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical work on the cellar and 1st floor (Spear Street Capital) as indicated on drawings.