Building Permits in ZIP 10011
Manhattan, NY — 1,125 permits filed recently
1,125 permits
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WC AND BAR FIXTURES PER PLAN. NO CHANGE in EGRESS, USE OR OCCUPANCY.
Proposed plumbing work in conjunction to general construction works. no change in use, egress and occupancy.
General Construction to take place on the cellar, first floor, and first floor mezzanine as per drawings filed herewith. No change in use, egress, or occupancy.
Mechanical modifications to take place on the first floor as per plans filed herewith. No change in use, egress, or occupancy.
Interior renovation of apt 22 on 4th floor as indicated on plans. no change in use, occupancy, means of egress or building bulk.
Interior renovation of apt 2 on 1st floor as indicated on plans. no change in use, occupancy, means of egress or building bulk.
Facade repairs no change in use egress or occupancy
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Interior renovation of apt 14 on 3rd floor as indicated on plans. no change in use, occupancy, means of egress or building bulk.
Facade repair
Erect an non-illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.
Interior renovation of existing single family dwelling on the basement and 001 through 004 floor. General Construction. Replace and install non load bearing partitions and interior finishes. No change...
Facade repairs no change in use egress or occupancy
Interior renovation of apt 14 on 3rd floor as indicated on plans. no change in use, occupancy, means of egress or building bulk.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
This application is filed for a temporary use permit for a sales office on the 4th floor including model apartments pursuant to section ac-28-111 and building bulletin 2010-22
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. NEW WC AND BAR FIXTURES PER PLAN. NO CHANGE in EGRESS, USE OR OCCUPANCY.
modify sprinkler system for new program layout
Proposed plumbing work in conjunction to general construction works. no change in use, egress and occupancy.
Mechanical modifications to take place on the first floor as per plans filed herewith. No change in use, egress, or occupancy.