Building Permits in ZIP 10010
Manhattan, NY — 677 permits filed recently
677 permits
Renovation of exist. duplex lower and upper level penhouse appartment located on 10th and 11th floor. new finishes as per plans submitted. structural , plumbing , meachanical , sprinkler work filed un...
Application filed for Plumbing and Mechanical modifications/additions as per plans filed herewith.
Plumbing work filed in conjunction with interior renovation. no change in use, egress or occupancy.
Modifications to the existing sprinkler system on the 17th Floor (Tempus) as per plans. No change to use, egress or occupancy.
Herewith filing Plumbing work and modifications to existing Sprinkler system in conjunction with office renovations.
Application filed for plumbing additions/modifications on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
Remove and replace/relocate bathroom fixtures at first floor. Install new sinks and equipment at cellar and 1st floor.
Herewith filing interior renovations of office suites, including new partitions millwork and finishes.
Herewith filing Plumbing work and modifications to existing Sprinkler system in conjunction with office renovations.
Herewith filing interior renovations of office suites, including new partitions millwork and finishes.
Remove and replace/relocate bathroom fixtures at first floor. Install new sinks and equipment at cellar and 1st floor.
Herewith filing Plumbing work and modifications to existing Sprinkler system in conjunction with office renovations.
Application filed for plumbing additions/modifications on the 4th floor as per plans filed herewith. no change in use, egress, or occupancy.
8949 - Filing for modifications to trader Joes plumbing fixtures. NO change in egress use or occupancy. Pro cert requested.
Herewith filing general construction modifications for Boiler Replacement project. No change in use, egress, or occupancy.
Installation of heavy duty sidewalk shed during building alteration, filed separately. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under...
Sprinkler modifications taking place on the 9th floor, 9th floor mezzanine and roof as per drawings filed herewith. no change in use, egress or occupancy.
Partial renovation of the existing second floor, including interior floor, ceiling, and installation of new sheetrock.
Installation of heavy duty sidewalk shed during building alteration, filed separately. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under...
Sprinkler modifications taking place on the 9th floor, 9th floor mezzanine and roof as per drawings filed herewith. no change in use, egress or occupancy.