Building Permits in ZIP 10010
Manhattan, NY — 677 permits filed recently
677 permits
Mechanical modifications (ste 310) as indicated on plans. no change in use, egress or occupancy.
Filing for interior reno of 32nd floor brighttower office as per plans submitted herewith.
Application filed for sprinkler additions/modifications on the 10th floor as per plans filed herewith. no change in use, egress, or occupancy.
Filing for interior reno of 32nd floor brighttower office space as per plans submitted herewith.
Sprinkler modifications taking place on the 8th floor, and roof as per drawings filed herewith. no change in use, egress or occupancy.
Structural framing and partial demo of existing masonry wall for new wall opening
Installation of temporary stair access platform and stairs. no change in use, occupancy, or egress.
Filing for the replacement of an existing cooling tower.
Non-illuminated non-advertising double-sided projecting accessory sign - tatte bakery & cafe. no change of use, egress or occupancy.
Non-illuminated non-advertising double-sided projecting accessory sign - tatte bakery & cafe. no change of use, egress or occupancy.
Installation of temporary support columns at 1st floor building entrance portico. Obtain permit to clear ECB violation #39143499J.
Application filed for plumbing additions/modifications on the 10th floor as per plans filed herewith. no change in use, egress, or occupancy.
Non-illuminated non-advertising double-sided projecting accessory sign - tatte bakery & cafe. no change of use, egress or occupancy.
Installation of temporary support columns at 1st floor building entrance portico. Obtain permit to clear ECB violation #39143499J.
Installation of temporary stair access platform and stairs. no change in use, occupancy, or egress.
Non-illuminated non-advertising double-sided projecting accessory sign - tatte bakery & cafe. no change of use, egress or occupancy.
Filing for the replacement of an existing cooling tower.
Application filed for plumbing additions/modifications on the 10th floor as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of existing unit 10b at 10th floor. new and relocated plumbing fixtures, interior partitions, lighting, and finishes in bathroom. exterior windows replaced. no change in use, egres...
Installation of a temporary scaffold as per plans in in conjunction with general construction. no change in use, egress or occupancy. scaffold shall comply with 2022 nyc building code, chapter 33