Building Permits in ZIP 10010
Manhattan, NY — 683 permits filed recently
683 permits
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Removal of sprinkler heads and plumbing fixtures.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
The scope of work includes the installation of outriggers as shown in provided drawings for local law masonry facade repair. no change in use, egress or occupancy under this application.
The scope of work includes the installation of outriggers as shown in provided drawings for local law masonry facade repair. no change in use, egress or occupancy under this application.
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
General construction modifications with interior demoliation taking place on the 8th fl as per drawings filed herewith. no change in use, egress or occupancy.
Verizon Modification. Replace 6 RRH units, remove 1 cabinet with existing platform, install new platform with cabinets. Install 2 microwave antennas, install 1 GPS antenna
Removal of sprinkler heads and plumbing fixtures.
Sprinkler work on the 15th floor as plans filed herewith. no change in use, egress, or occupancy.
Sprinkler work on the 15th floor as plans filed herewith. no change in use, egress, or occupancy.
Installation of plumbing fixtures and piping for renovation of wig manufacturing and accessory use offices. filed in conjuction with m01244583.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Standpipe work from the 2nd to the 6th floor as plans filed herewith. no change in use, egress or occupancy.
Plumbing work from the cellar, 2nd to the 6th floors as plans filed herewith. no change in use, egress, or occupancy.
General construction on the 15th floor as plans filed herewith. no change in use, egress, or occupancy.
Standpipe work from the 2nd to the 6th floor as plans filed herewith. no change in use, egress or occupancy.
Installation of plumbing fixtures and piping for renovation of wig manufacturing and accessory use offices. filed in conjuction with m01244583.
Plumbing work from the cellar, 2nd to the 6th floors as plans filed herewith. no change in use, egress, or occupancy.
General construction for interior renovation of Apartment 7C on the 8th floor, as shown on drawings filed herewith. No change in use, egress, or occupancy.