Building Permits in ZIP 10010
Manhattan, NY — 677 permits filed recently
677 permits
East Midtown Plaza Bldg H, Phase 6 exterior FISP Cycle 9 related facade repairs as per the plans filed including: Concrete spall & crack repairs. Sheet metal and brick masonry replacement.
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
Renovation of existing building lobby, including finishes and entrance vestibule. Minor alterations to adjacent retail tenant storefronts. No change in use, egress or occupancy.
Structural work as shown on plans. No change to use, egress, or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of interior non-bearing partitions as per plans filed herewith. No change in use, egress, or occupancy.
Installation of interior non-bearing partitions as per plans filed herewith. No change in use, egress, or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation and use of temporary supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
Sh/jhs47m - for temporary construction equipment (shed)submitting on behalf of contractor, related to job # m00817245, no change in use,occupancy or egress
Proposed exterior facade restoration as per plans filed herewith.no change in use, egress or occupancy.
General construction modifications taking place on the facade as per drawings filed herewith. No change in use, egress or occupancy.
Installation of temporary plywood enclosure & barricade as per plans. no change in use, egress or occupancy.
Gas connection to replacement boilers.
Herewith filing Fuel Oil Storage Removal in cellar. No change in use, egress, or occupancy.
Application is filed for interior renovation of non-load bearing partitions and finishes for new bathrooms, mech./storage rooms & corridors on the partial 2nd & 3rd floors as per plans submitted. no c...
Installation of temporary plywood enclosure & barricade as per plans. no change in use, egress or occupancy.
Application is filed for interior renovation of non-load bearing partitions and finishes for new bathrooms, mech./storage rooms & corridors on the partial 2nd & 3rd floors as per plans submitted. no c...
Proposed exterior facade restoration as per plans filed herewith.no change in use, egress or occupancy.