Building Permits in ZIP 10009
Manhattan, NY — 384 permits filed recently
384 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Erect an illuminated sign on wall.not within view of arterial highway or public park 1/2 acre or more. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Filing for the installation of a new accessible ramp within the property line. Replace and relevel existing concrete walkway within the property line. No change to use, egress or occupancy.
Installation of a heavy duty sidewalk shed as per plans during facade repairs. no change in use, egress or occupancy. sidewalk shed to comply with 2022 nyc building code, chapter 33.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Filing for the installation of a new accessible ramp within the property line. Replace and relevel existing concrete walkway within the property line. No change to use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of a heavy duty sidewalk shed as per plans during facade repairs. no change in use, egress or occupancy. sidewalk shed to comply with 2022 nyc building code, chapter 33.
Installation of temporary suspended scaffold equipment
Proposed work @ Exposure 2/west and north elevation, crack running throughout exterior wall, Rebuild parapet & exposure 2, west elevation as per plans. Address DOB Violation 010626CFA0301EM, 01062026F...
Fabrication and installation of 2nd floor fire balcony at front of existing building, to comply with existing second means of egress for the building.
Proposed work @ Exposure 2/west and north elevation, crack running throughout exterior wall, Rebuild parapet & exposure 2, west elevation as per plans. Address DOB Violation 010626CFA0301EM, 01062026F...
Fabrication and installation of 2nd floor fire balcony at front of existing building, to comply with existing second means of egress for the building.
Installation of temporary suspended scaffold equipment
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATIONS AND CONVERSION FROM EXISTING COMMERCIAL BUILDING INTO A 8 FAMILY 4 STORY AND CELLAR RESIDENTIAL BUILDING. (All new interior finishing's & MEP, SP, P...
Renovation of existing commercial space in first floor with plumbing work. no change in use, egress or occupancy under this application.
Renovation of existing commercial space in first floor with plumbing work. no change in use, egress or occupancy under this application.
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATIONS AND CONVERSION FROM EXISTING COMMERCIAL BUILDING INTO A 8 FAMILY 4 STORY AND CELLAR RESIDENTIAL BUILDING. (All new interior finishing's & MEP, SP, P...