Install of temp platform and frame structure, no alt to exist structures for Masters at MSP. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All production equipme...
Install of temp platform and frame structure, no alt to exist structures for Masters at MSP. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All production equipme...
Mechanical application filed to register certificate of compliance on previously installed chiller on 30th fl mer
Mechanical application filed to register certificate of compliance on previously installed chiller on 30th fl mer
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 10th floor (CCRB), as per plans. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Erect, maintain and dismantle sidewalk shed as per plans filed herewith. no change to use, egress or occupancy.
Modifications to the existing HVAC system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system and associated ducts & piping on the 10th floor (CCRB) as per plans. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Erect, maintain and dismantle sidewalk shed as per plans filed herewith. no change to use, egress or occupancy.
Modifications to the existing HVAC system on the 3rd floor (Pre-build) as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 10th Floor (CCRB) as per plans. No change to use, egress or occupancy.
Installation of +/-112 feet high x +/- 16 feet wide temporary supported scaffolding & stair tower, as per plans, for exterior partial roof replacemen / reapir work. no change in use, egress or occupan...
Installation of +/-112 feet high x +/- 16 feet wide temporary supported scaffolding & stair tower, as per plans, for exterior partial roof replacemen / reapir work. no change in use, egress or occupan...
Plumbing work at Penthouse Duplex on floors 31 and 31 Mezzanine. No change to use, egress or occupancy.
Erect non-load bearing partition to divide commercial space, no change in use, egress or occupancy
filed herewith installation of sprinkler heads and associated piping. no change of use, occupancy or egress.
Erect non-load bearing partition to divide commercial space, no change in use, egress or occupancy
filed herewith installation of sprinkler heads and associated piping. no change of use, occupancy or egress.