Building Permits in ZIP 10007
Manhattan, NY — 285 permits filed recently
285 permits
Mechanical modifications on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical modifications on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Facade restoration as per plans filed herewith. No change in occupancy, use or egress.
General construction taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Scope of work will include Installation of Plumbing Fixtures and Sprinkle modifications to an existing sprinkler systems as indicated on plans. No change in use ,occupancy or egress.
Install temp platforms, Truss, scenic elements, prod equipment ,no alt to exist structures for CDC Times Square. TPA not required. Producer responsible to monitor site safety & implement HWAP. Product...
Installation of temporary overhead/roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead/roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Scope of work will include Installation of Plumbing Fixtures and Sprinkle modifications to an existing sprinkler systems as indicated on plans. No change in use ,occupancy or egress.
Install temp platforms, Truss, scenic elements, prod equipment ,no alt to exist structures for CDC Times Square. TPA not required. Producer responsible to monitor site safety & implement HWAP. Product...
Create new roof deck at 6 floor set back terrace renovate 6th floors as per plans filed
Create new roof deck at 6 floor set back terrace renovate 6th floors as per plans filed
Install new sprinkler system for new tenant fit out as per plans for the south side of the building on the 21st floor only under this application.
Install new sprinkler system for new tenant fit out as per plans for the south side of the building on the 21st floor only under this application.
suspended Scaffold installation as per plans filed herewith.
Plumbing work filed in conjunction with apartment #61D renovation
Install new sprinkler system for new tenant fit out as per plans for the south side of the building on the 21st floor only under this application.
Install a new HVAC system on the 1st floor and the 2nd floor setback roof for the existing eating and drinking establishment. No change in use, occupancy, or egress.
Install a new HVAC system on the 1st floor and the 2nd floor setback roof for the existing eating and drinking establishment. No change in use, occupancy, or egress.
Plumbing work filed in conjunction with apartment #61D renovation