Installation of new plumbing fixtures on the existing retail space, installation of new gas meter and hot water heater as per plans. No change in use, egress or occupancy.
Modification of existing sprinkler system on the first floor and cellar as per plans
Installation of new plumbing fixtures on the existing retail space, installation of new gas meter and hot water heater as per plans. No change in use, egress or occupancy.
Modification of existing sprinkler system on the first floor and cellar as per plans
Relocate and provide new sprinkler heads on existing system in existing office space on 10 fl in conjunction with alt #m01349048 as per plans filed no change in use occupancy or egress
Relocate and provide new sprinkler heads on existing system in existing office space on 10 fl in conjunction with alt #m01349048 as per plans filed no change in use occupancy or egress
Installation of suspended scaffold for facade work or inspection.
Installation of suspended scaffold for facade work or inspection.
Installation of 7,100 lb dual personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 7,100 lb dual personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Modification to existing VERIZON site on the roof. Replacement of 6 antennas, 6 RRH units and 3 cabinets. Installation of 3 antennas and 3 RRH units. Removal of 3 cabinets on existing platform.
Modification to existing VERIZON site on the roof. Replacement of 6 antennas, 6 RRH units and 3 cabinets. Installation of 3 antennas and 3 RRH units. Removal of 3 cabinets on existing platform.
Interior plumbing demolition as shown on plans filed herewith
Interior plumbing demolition as shown on plans filed herewith
Sprinkler modifications taking place on the 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Sprinkler modifications taking place on the 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Interior non-structural demolition as shown on plans filed herewith.
Interior demolition of mechanical systems, as shown on plans filed herewith
Interior non-structural demolition as shown on plans filed herewith.