Building Permits in ZIP 10006
Manhattan, NY — 181 permits filed recently
181 permits
Sprinkler system modifiction including new sprinkler heads installation as per plans filed herewith. no change to use, egress, or occupncy.
Air conditioning unit replacement for the IT Room on the 31st floor. No change in use egress and occupancy.
Proposed installation of suspended scaffold as per plan. no change in use, occupancy and egress under this application.
Installation Of Temporary Material Hoists As per the plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
provide pantry sinks and HWHs for existing office on 27 fl (marketed as 28) in conjunction with ALT #M01109242 as per plans filed no change in use occupancy or egress
Relocate sprinkler heads on existing sprinkler system in office space on portion of 11fl in conjunction with alt #m01375269 as per plans filed no change in use occupancy or egress
Plumbing fixtures installation and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Installation of suspended scaffold during facade inspection/repair.
Relocate sprinkler heads on existing sprinkler system in office space on portion of 11fl in conjunction with alt #m01375269 as per plans filed no change in use occupancy or egress
Plumbing fixtures installation and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Installation of suspended scaffold during facade inspection/repair.
provide pantry sinks and HWHs for existing office on 27 fl (marketed as 28) in conjunction with ALT #M01109242 as per plans filed no change in use occupancy or egress
Mechanical ductwork and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Plumbing modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing modifications taking place on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical ductwork and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Suspended scaffold for Facade repair works and inspections
Suspended scaffold for Facade repair works and inspections
Provide pantry sink and HWH for existing office space in conjunction with Alt # M01375269 as per plans filed no change in use occupancy or egress