Building Permits in ZIP 10006
Manhattan, NY — 82 permits filed recently
82 permits
Structural modifications as shown on filed plans
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenwich st.
Modifications of the existing sprinkler system and installation of TCSP. No change in use, egress of occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at washington street and carlisle street elevations..
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection at neighbor roof at 109 washington street and 110 greenwich street.
Interior renovation and mechanical hood of for commercial kitchen at basement floor #c4, as per plan filed herewith. no change in use, egress or occupancy.
Install of temporary window protection per plan. no change in use, egress, or occupancy. the window protection on 4 windows on the s elev at 110 greenwich st and w elev 108 greenwich st, 14 windows on...
Plumbing work associated with the conversion of the building
Interior plumbing demolition work as shown on filed plans
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Office renovation on 30th floor as per plans filed herewith. no change to use, egress, or occupancy.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation Of Temporary Material Hoists As per the plans submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Air conditioning unit replacement for the IT Room on the 31st floor. No change in use egress and occupancy.
Sprinkler system modifiction including new sprinkler heads installation as per plans filed herewith. no change to use, egress, or occupncy.
Proposed installation of suspended scaffold as per plan. no change in use, occupancy and egress under this application.
Installation of suspended scaffold during facade inspection/repair.
provide pantry sinks and HWHs for existing office on 27 fl (marketed as 28) in conjunction with ALT #M01109242 as per plans filed no change in use occupancy or egress
Relocate sprinkler heads on existing sprinkler system in office space on portion of 11fl in conjunction with alt #m01375269 as per plans filed no change in use occupancy or egress