Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Overhead protection for occupants at courtyard.
T-Mobile: Relocation of existing antenna sector and installation of kickbacks on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
Installation of pipe scaffold stair tower as per plans. stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 51st floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation and use of temporary sidewalk shed equipment as per plans filed herewith. no change to use, egress or occupancy under this application.
Installation and use of temporary suspended scaffold for facade inspection and repairs as per plans filed herewith. no change to use, egress, or occupancy under this application.
Modification of existing sprinkler system no change in use, egress or occupancy. Renovation of existing of partial commercial floor with new plumbing fixtures as per drawings herein.
Installation of temporary material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporary construction fence as per plans. no change in use, egress or occupancy. fence to comply with 2022 nyc building code, chapter 33.
Interior demolition as per plans filed herewith. No change to use, egress or occupancy.
TBD
Non-illuminated non-advertising accessory wall sign approved as per nyc landmark preservation commission docket# 26-05161 - ny gifts. no change of use, egress or occupancy.
facade repair
Plumbing work for tenant fit-out in Retail 1. Alt 1 121190086
Install walls, doors, floor finishes and ceilings per plans
Mechanical modifications taking place on the 6th floor as per drawings filed herewith. no change in use, egress or occupancy.
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 25th floor (26th floor marketing) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Exterior window removal and replacement on floors 2 through 17 only. no change in occupancy, use or egress. existing curtain wall system and spandrel glass to remain.
General construction modifications taking place on the 6th floor as per drawings filed herewith. no change in use, egress or occupancy.