Building Permits in ZIP 10003
Manhattan, NY — 1,064 permits filed recently
1,064 permits
Filing herewith general construction to include windows replacement on the 5th floor as per plans
Installation of industrial rope access for facade inspections.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Herewith filing general construction modifications for Inpatient Unit, NYU Langone Orthopedic Hospital. No change in use, egress, or occupancy.
Herewith filing mechanical modifications for Inpatient Unit, NYU Langone Orthopedic Hospital. No change in use, egress, or occupancy.
Herewith filing mechanical modifications for Inpatient Unit, NYU Langone Orthopedic Hospital. No change in use, egress, or occupancy.
Installation of industrial rope access for facade inspections.
Filing herewith general construction to include windows replacement on the 5th floor as per plans
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Herewith filing general construction modifications for Inpatient Unit, NYU Langone Orthopedic Hospital. No change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Sh/ps751m - for temporary construction equipment (emergency shed) submitting on behalf of contractor, related llw#141073 no change in use, occupancy or egress
Mechanical work for combination of apt 1e and 1w.
Installation of sidewalk shed as indicated on the attached drawings. there are no changes in use, egress or occupancy.
Filing subsequent mechanical application for installation of AC unit and associated equipment in retail space and courtyard, as per plans submitted.
Installation of new chimney exhaust flue extension. No change to use, egress or occupancy.
Installation of new chimney exhaust flue extension. No change to use, egress or occupancy.
Installation of sidewalk shed as indicated on the attached drawings. there are no changes in use, egress or occupancy.