Building Permits in ZIP 10003
Manhattan, NY — 1,064 permits filed recently
1,064 permits
Filing subsequent sprinkler application for new and relocated sprinkler heads in existing retail space, as per plans submitted.
General Construction work. Walls, penetration through work in court yard
Filing subsequent sprinkler application for new and relocated sprinkler heads in existing retail space, as per plans submitted.
Temporary Construction Fence
Plumbing work in apt 501 as per plans. no change in use, occupancy, or egress.
Interior renovation of apt 501. parttiion changes to non-load bearing walls as per plans. no change in use, occupancy, or egress.
Modifications to existing Sprinkler system as per plans filed herewith. no change in use, egress or occupancy.
Installation of temporary supported scaffold filed in conjunction with exterior facade & restoration repairs as per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in...
Install new lavatory and water closet in half bath.
Alteration Type 2 to combine two units on the 2nd floor as per TPPN 3/97 and renovate the apartments on the basement and 1st floor . All work as per plan. No change in use, egress, oroccupancy.
Restoration of facade elements. no change in use, egress or occupancy.
Modifications to existing load-bearing masonry window & exterior door openings. Removal/replacement of windows & exterior doors. Removal & construction of new non-load-bearing partitions, doors & fini...
Alteration 2 to combine two units on the 3rd floor as per tppn 3-97. all as per plan. no change in use egress or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at the south elevation on east 16th street front of the building.
New interior & exterior renovations with associated demolition to an existing commercial retail structure
Mechanical modification pipe expansion
M040_Scope of work to repair roof and exterior masonry. Provide flood elimination. Remove and replace parapet, windows and window guards.
Sprinkler modification work on the first floor. no change to use egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Replace existing sump pump and provide new floor drains.