Building Permits in ZIP 10003
Manhattan, NY — 1,076 permits filed recently
1,076 permits
Interior renovation of a store to be a nail salon. no change in use, occupancy, or egress.
Mechanical work as per plans filed herewith. no change in use, egress and occupancy,
Renovation and combination of apts #10k & 10l, minor non structural partition work; removal of one kitchen and some bath plumbing work filed as a subsequent. no change in egress, use or occupancy
Modification to existing plumbing system in Apt. #15, as per plans filed herewith. No change in use, egress or occupancy.
Modification of HVAC system. Remove existing and Install new HVAC system at Cellar, Basement , and 1st floors.
Renovation of apt. 21f on 21st floor with partiton work as per plan. no change in use, occupancy or exit.
Combination of Apartments 11A and 11H. Interior renovation including removal of 1 laundry in apartment 11A and 1 kitchen in 11H. Minor partition changes.
Plumbing fixtures filed in conjunction with dob now gc. no change to use, occupancy or egress.
Replacement of cooling tower. no change to use, egress, or occupancy.
Structural work for new stair opening at Basement level.
Installation of new circulation lines for existing domestic water system. installation of new domestic water branch lines. no change in egress or occupancy.
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Plumbing work filed for the installation of new water heater as per plans. No change in use egress or occupancy.
Combination of units 2b & 2c into one unit per tppn 3-97. removal & capping of gas stove (2b kitchen) & installation of bath in existing 2b kitchen. relocation of kitchen and conversion of 2c kitchen...
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Replacement of cooling tower. no change to use, egress, or occupancy.
Installation of new circulation lines for existing domestic water system. installation of new domestic water branch lines. no change in egress or occupancy.
Combination of Apartments 11A and 11H. Interior renovation including removal of 1 laundry in apartment 11A and 1 kitchen in 11H. Minor partition changes.
Modification of HVAC system. Remove existing and Install new HVAC system at Cellar, Basement , and 1st floors.
Combination of units 2b & 2c into one unit per tppn 3-97. removal & capping of gas stove (2b kitchen) & installation of bath in existing 2b kitchen. relocation of kitchen and conversion of 2c kitchen...